The City of Red Bank has announced a second delay in the Ashland Terrace road project. In addition to the numerous periods of heavy rains and below normal temperatures, the upcoming holidays and length of time the concrete needs to cure are additional factors delaying the completion date to Jan. 4, 2019.
The city will take every step possible to reopen Ashland Terrace before this date and appreciates everyone’s patience as the repairs and replacement of this critical road structure continues.
Updates on the construction along with additional information can be found at http://ashlandterraceproject.com