Chance Of Rain Postpones Traffic Shift On U.S. 27 To Friday Night

Thursday, February 21, 2013

Due to the possibility of rain later Thursday evening, TDOT has decided to postpone the scheduled U.S. 27 southbound traffic shift until Friday night. If Friday night is not conducive to the work, then it will be moved to Saturday. 

The new alignment will be in effect on Saturday morning, resulting in traffic traveling south on U.S. 27 being routed onto the newly-constructed southbound lanes from Signal Mountain Boulevard to the closed Whitehall Road slip ramp. U.S. 27 South traffic will merge into the existing center lane, and the right lane will become an “exit only” lane. Traffic entering from Signal Mountain Boulevard onto U.S. 27 South will also be routed onto the new southbound lanes. 

Because of the new traffic alignment, motorists are strongly encouraged to remain alert and follow directional signs when approaching the construction zone. The Tennessee Highway Patrol will be on duty several mornings to assist with traffic control and speed enforcement as drivers get accustomed to the new traffic pattern.  Overhead signs and message boards will also be used to inform drivers of the new traffic pattern. 

This traffic configuration will remain in effect until the remaining southbound retaining walls and the ramps to Manufacturers Road are completed, which is scheduled to take place by early June 2013.  This phase of construction is part of the large project underway to reconstruct U.S. 27 from the Olgiati Bridge over the Tennessee River to Signal Mountain Boulevard (SR-8/U.S. 127).  The contractor for the $104 million project is Wright Brothers Construction Co., Inc. of Charleston, TN.  The estimated completion date for the entire project is December 21, 2014.

Should inclement weather or unforeseen circumstances prevent this traffic shift from occurring as scheduled, it will be rescheduled to take place as soon as possible.

For travel information visit the TDOT SmartWay web site at or call 5-1-1.  You can also receive traffic alerts via TDOT’s multiple Twitter feeds, including statewide traffic tweets@TN511 or Chattanooga area alerts @Chattanooga511

Android and iPhone users can download TDOT’s SmartWay Mobile App to assist them in navigating Tennessee highways.  The app provides up-to-the-minute customized traffic information and enables the user to access TDOT’s SmartWay cameras, messages displayed on overhead Dynamic Message Signs, and information on construction related lane closures and incidents on interstates and state routes.  The TDOT SmartWay App is free and available for download in the Apple App Store and Play Store for Android. 

As always, drivers are reminded to use all motorist information tools wisely and Know Before You Go! by checking travel conditions before leaving for their destination.  Drivers should never tweet, text or talk on a cell phone while behind the wheel.

Latest Hamilton County Jail Booking Report

Here is the latest jail booking report from Hamilton County: AKINS, MARY ELIZABETH  500 16TH ST NORTH EAST FORT PAYNE, 35967  Age at Arrest: 31 years old Arresting Agency: Hamilton County VIOLATION OF PROBATION ( DRIVING ON REVOKED) VIOLATION OF PROBATION ( FAILURE TO MAINTAIN LANE) VIOLATION OF PROBATION ( THEFT UNDER 500 ) VIOLATION OF PROBATION ( POSSESSION ... (click for more)

Operators Of McDonald Farm In Sale Creek Evaluating When It Will Re-Open After Fire

Officials at McDonald Farm in Sale Creek are evaluating when it will reopen after its large barn was destroyed by fire on Sunday morning. Officials said, "Due to a fire in our main equipment barn, McDonald Farm had to close Sunday. We are currently evaluating when we will be able to re-open. "Thanks to everyone for your outpouring of support and well wishes. It has truly been ... (click for more)

Ole Man River Just Keeps Rollin

Citizens are hearing yet another new chapter in Chattanooga’s 21st Century Riverfront concrete repair saga. It seems it will require more repair, more delays and more tax dollars to do it. When will it end? Construction of the Riverfront concrete structures began in 2003. Before it was finished, designers, engineers, contractors, Public Works officials, Mayor Littlefield and ... (click for more)

Roy Exum: It Was Our Tool Shed

Some said the huge beams had been soaking in creosote for two or three years when the men finally stacked them to dry. They were long, about 20 feet each, and thick – maybe eight inches. I remember they were 14 inches wide but the biggest thing I remember was that it was the ugliest lumber I ever saw. They cured the beams for one entire hot summer in the Tool Shed, a huge building ... (click for more)

Sale Creek Comes Back To Beat Silverdale For 3-A Volleyball Crown

It's been an incredible run for the Silverdale Lady Seahawks in recent days as they shocked everyone except themselves by winning the District 5-A volleyball tournament last week. They entered as the third-seeded team before knocking off number-two Boyd-Buchanan in the semifinals and then top-seeded Grace in the final. That run of good fortune continued at Sale Creek's McEwen ... (click for more)

Ooltewah Makes Short Work Of White County In 3-3A Volleyball

Ooltewah had one goal going into Monday night’s Region 3-3A volleyball tournament match against White County. Don’t mess this up. The Lady Owls, shooting for their third regional championship in four years, never wavered in thrashing the outmanned Warriorettes, 3-0, and advanced to Tuesday’s championship match against the Walker Valley. Game scores bear out the one-sided ... (click for more)