Weekly Road Construction Report

  • Thursday, June 14, 2018

Here is the weekly road construction report for Hamilton County:

I-75 North Exit 1 interchange reconfiguration project at mile marker 1:   Work on this project continues. There is now only one exit ramp that allows drivers to turn both east and west on Ringgold Road at a signalized intersection. Traffic has been shifted onto the newly constructed portion of Camp Jordan Pkwy., and the intersection (I-75 NB off-ramp and SR-8/Camp Jordan Pkwy.) is now controlled by a traffic signal. Estimated project completion date is June. [C.W. Matthews Contracting/City Of East Ridge/LCLPRGM]  

US-27 (I-124) widening from I-24/US-27 interchange to north of the Olgiati Bridge over the Tennessee River, including widening the Olgiati Bridge:   Work on this project continues. The contractor has closed the 12th Street tie-in ramp to US-27 South. This closure will be in place through 06/18. Traffic from 12th Street will be detoured to Carter Street and then to westbound MLK Blvd. where motorists may access the US-27 South on-ramp. Detours are posted. Motorists should exercise caution when traveling through the construction zone and pay close attention to the detour signage posted. The speed limit on US-27 in the construction zone remains 45 MPH. THP will assist with traffic control on the project as necessary RESTRICTIONS: I-124 (US-27) Northbound Exit 1C 4th Street Off Ramp. No oversize/over-dimensional loads. Width Limit is 11 feet. Estimated project completion date is January 2020. [Dement Construction Company, LLC/Micka/CNP230] 

SR-111 resurfacing from SR-29 to Jones Gap Road:   During this report period the contractor will have lane closures in place during resurfacing operations. No closures will occur from 5-8 a.m. in the southbound direction and from 4-6 p.m. in the northbound direction. Flaggers will be on hand to assist as needed. Estimated project completion date is July. [Wright Brothers, LLC/Pruett/CNS020]  

SR-320 (East Brainerd Road) grading, drainage, installation of signals, construction of seven retaining walls and paving from east of Graysville Road to east of Bel-Air Road:   During this report period, the contractor will have intermittent lane closures between 9 a.m.-2 p.m. This work may affect either direction of East Brainerd Road or side streets from Graysville Road to Bel-Air Road. Flaggers will assist with traffic control as needed.  Estimated project completion date is June. [Jones Bros. Contractors, LLC/Pruett/CNN383]  

The tunnel cleaning of the McCallie Tunnel on US-11 (US-64, SR-2), the Stringers Ridge Tunnel on US-127 (SR-8), and the Bachman Tubes on US-41 (US-76, SR-8):   The nighttime cleaning operation of McCallie Tunnels, Stringers Ridge Tunnel, and Bachman Tubes occurs between 8 p.m.-6 a.m. Tunnels will be closed during cleaning and detours will be marked accordingly, as each tunnel is cleaned. This work is scheduled to begin on Wednesday at the McCallie tunnels (SR-2) and proceed to the Stringer's Ridge tunnel (SR-8) and on Thursday, June 21, the Bachman Tubes (SR-8) will be cleaned.  Estimated project completion date is June. [ETI Environmental, Inc./Micka/CNR223] 


Happenings
Austin Hatcher Foundation Brings “Monday After The Masters” Golf Tournament To The Farm Golf Club In Dalton
  • 5/6/2024

The Austin Hatcher Foundation for Pediatric Cancer is hosting its third annual golf tournament, “Monday After the Masters" on Monday, May 13 at the Farm Golf Club in Dalton. The golf tournament, ... more

New Hamilton County Marriage Licenses
  • 5/6/2024

Here are the new marriage licenses from the County Clerk's office: KERIN RENEE PHILLIPS ROBERT CHRISTOPHER WILLIAMSON 108 CHELSEA DR 8336 IRIS RD ROSSVILLE, Georgia 307412435 CHATTANOOGA, ... more