Replacing Glass Panels On Holmberg Bridge Winds Up Costing $519,043

  • Saturday, February 2, 2019

Replacing the glass panels on the Holmberg Bridge wound up costing the city $519,043.

The span connecting the Walnut Street Bridge to the Hunter Museum originally featured glass panels that were illuminated at night.

However, the panels would often crack and it cost several thousand dollars to replace each one.

It was finally decided to install aluminum panels instead and that work has been completed.

The work was performed by Ross Glass and Aluminum.

A contingency amount of $20,914 was set aside, but was not used.

Breaking News
Arrest Made In April Shooting On Tunnel Boulevard
Arrest Made In April Shooting On Tunnel Boulevard
  • 5/3/2024

The Chattanooga Police Department has arrested Geonta Gaines, 29, in relation to the shooting that occurred on April 11, in the 600 block of Tunnel Boulevard. On April 11, at 1:23 p.m., ... more

3 Shot In Chattanooga Late Wednesday Afternoon; 2 Later Die
3 Shot In Chattanooga Late Wednesday Afternoon; 2 Later Die
  • 5/3/2024

Three people were shot late Wednesday afternoon. Two of the men, 19 and 21, have died as a result of their injuries. Chattanooga Police were dispatched at 5:26 p.m. to a person shot call ... more

Latest Hamilton County Arrest Report
  • 5/3/2024

Here is the latest Hamilton County arrest report: AMEY, CORDERIOUS LEBRON 4103 DAYTON BLVD CHATT, 37415 Age at Arrest: 30 years old Arresting Agency: Chatt St Police AGGRAVATED CRIMINAL ... more