Here is the weekly road construction report for District 29:
BRADLEY COUNTY I-75 at Paul Huff Parkway Interchange modifications: During this reporting period, the contractor will continue work on new traffic signals. Intermittent flagging operations and temporary lane closures may be necessary. Motorists are advised to reduce speed and use caution in the work zone.
[Summers-Taylor, Inc./Cleveland/CNX362]
BRADLEY COUNTY I-75 resurfacing from south of MM 18.6 (LM 3) to north of Exit 20 (LM 5.4): During this reporting period, the contractor will be working on removing construction signs. Nightly lane closures will occur as needed between the hours of 7:00 PM until 6:00 AM. Motorists are advised to reduce speed and use caution in the work zone.
[Talley Construction Company, Inc./Cleveland/CNX405]
BRADLEY COUNTY SR-60 widening from the 4-lane north of I-75 (LM 17.2) to SR-306 (LM19.9): During this reporting period, the contractor will continue grading work and install new curb & gutter. Asphalt paving is expected to begin. Intermittent flagging operations will take place throughout the project during various work activities. The speed limit in the work zone has been reduced to 35 mph. Motorists are advised to use caution in the work zone and watch for flaggers assisting with traffic control.
[Summers-Taylor, Inc./Cleveland/CNV130]
BRADLEY COUNTY SR-312 (HARRISON PK.) Utility Work both directions from LM 7.67 to LM 7.55: Flagger assisted westbound lane closure between Conner Rd and 700’ west of Westside Dr NW. Motorists should reduce speed and be prepared to stop. Flaggers, trucks, signage, and barrels/cones will be present, 09/16/24 to 11/24/24 between from 9 am - 2 pm. [2024-164]
BRADLEY COUNTY SR-311 resurfacing from SR-60 (LM 5) to SR-74 (LM 6.1): During this reporting period, the contractor will continue permanent pavement markings on SR-311. Intermittent flagging operations may be necessary around the work area. Motorists are advised to reduce speed and use caution in the work zone.
[Wright Brothers Construction Company, Inc./Cleveland/CNX132]
BRADLEY COUNTY SR-40 (US-64) resurfacing from SR-2 (US-11, US-64, LM 0.0) to near McKamy Street (LM 1.2): During this reporting period, the contractor is scheduled to continue permanent pavement markings on SR-40. Intermittent lane closures and flagging operations will be necessary during this work.
[Wright Brothers Construction Company, Inc./Cleveland/CNX132]
BRADLEY COUNTY SR-74 resurfacing from SR-311 (LM 12.7) to SR-40 (US-64, LM 13.9): During this reporting period, the contractor will continue permanent pavement markings on SR-74. Intermittent flagging operations may be necessary around the work area. Motorists are advised to reduce speed and use caution in the work zone.
[Wright Brothers Construction Company, Inc./Cleveland/CNX132]
BRADLEY COUNTY SR-74 to north of Inman Street (13.9) to north of SR-60 (15.5): During this reporting period, the contractor will complete punch list work on SR-74. Motorists are advised to reduce speed and use caution in the work zone.
[Talley Construction Company, Inc./Cleveland/CNY095]
HAMILTON COUNTY I-75 at I-24 Interchange Reconstruction Phase 2: Nightly Lane closures will occur on this project, 9 PM to 6 AM, on I-75 North and South between Exit 1 (East Ridge) and Exit 3A (East Brainerd Road/ SR-320) and on I-24 East and West from Germantown Road to Spring Creek Road, MM182 to MM185, for various construction activities. Uniformed police officers will be present in these work zones to assist with traffic management and to enforce traffic laws. (Note: The contractor is currently scheduled to have nighttime lane closures on the ramp from I-24 East to I-75 North on Thursday (11/14) for guardrail repair. Also, on I-75 South on Monday (11/18), temporary closures are necessary to set beams on the new bridge being constructed on I-75 over the railroad south of the East Brainerd Road interchange.) It may also be necessary to do short duration (15 to 30 minutes) rolling roadblocks during the day or night for patching potholes, clearing debris or to repair guardrail, attenuators, etc. Portions of the left lane on North and South Terrace between Belvoir Avenue and Spring Creek Road will be closed for installation of drainage structures, sanitary sewers, retaining and noise wall construction. (Note: Intermittent daytime non-rush hour lane closures, traffic shifts and flagging operations will take place Thursday (11/14) and Friday (11/15) on South Terrace and North Terrace to pave the approaches to the new bridges over I-24 on South Moore Road and McBrien Road.) All work is weather permitting. Moore Road and McBrien Road bridges over I 24 are closed as well as the entrance and exit ramps to I-24 between Belvoir Avenue and Moore Road. A continuous flow detour using Belvoir Avenue and Spring Creek Road is in place for local traffic. RESTRICTIONS: Moore Road and McBrien Road over I-24 closed. I-24 Ramps between Belvoir and Moore Road closed.
[Wright Brothers Construction Company, Inc./Maj Prj - Blevins/DB2101]
HAMILTON COUNTY SR-2 (LEE HWY.) Utility Work both directions from LM 17 to LM 18: Shoulder and lane closures on SR-2 (Lee Hwy) between Circle Drive and Hickory Valley Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, and barrels/cones will be present, 10/24/24 through 11/20/24 from 9 am - 2 pm. [2024-589 & 2024-617]
HAMILTON COUNTY SR-27 (ROSSVILLE BLVD.) Utility Work southbound at LM 7.35: Southbound lane closure on SR-27 (Rossville Blvd) between East 42nd Street and 7th Avenue. Motorists should reduce speed and be prepared to stop. Trucks, signage, and barrels/cones will be present, 11/14/24 through 11/20/24 from 9 am - 2 pm. [2024-737]
HAMILTON COUNTY SR-29 (US-27) TDOT Bridge Inspection both directions at LM 9.67: A routine bridge inspection will be conducted on the SR 29 bridges over Levi Road from 8 AM until 3 PM on Thursday, November 14, 2024. One lane will be closed for the duration of the inspection.
HAMILTON COUNTY SR-58 (OCHS HWY.) Utility Work northbound at LM 2: Road Closure with detour on SR-58 (Ochs Hwy) between Alabama Avenue and W. 41 Street. Motorists should reduce speed and follow detour signs. Trucks, signage, and barricades will be present, 11/04/24 from 10 pm to 4 am on 11/20/24. [2024-714]
HAMILTON COUNTY SR-8 (RINGGOLD RD.) Utility Work northbound at LM 2.45: Northbound lane closure on SR-8 (Ringgold Rd) between East End Avenue and West End Avenue. Motorists should reduce speed and be prepared to stop. Trucks, signage, and barrels/cones will be present, 11/18/24 through 11/20/24 from 9 am - 2 pm. [2024-584]
HAMILTON COUNTY SR-8 (W. MAIN ST.) Utility Work both directions from LM 8.09 to LM 8.32: Nighttime road closure and detour on W. Main St between Market St and Broad St. Signage for detour route and barricades will be present. Detour will reroute traffic to 20th St beginning 09/04/24 to 11/20/24 from 10 pm to 4 am. [2024-527]
HAMILTON COUNTY I-75 at the Hamilton Place Mall interchange: The SR-153 southbound ramp to I-75 northbound has been reduced to one lane. Traffic shifts have been implemented on I-75 northbound, Shallowford Road entrance ramps, and Shallowford Road exit ramps. There will be a potential lane closure on I-75 SB from 8 PM to 6 AM on 11/04/2024. The speed limit has been reduced on I-75 throughout the project limits. Nightly lane closures are permitted 8 PM to 6 AM. Motorists should use caution, paying attention to construction signage and watching for construction vehicles and personnel.
[Summers-Taylor, Inc./Chattanooga West/CNX358]
HAMILTON COUNTY Resurfacing on SR-29 (US-27) from south of Old Dayton Pike (LM 25.7) to north of Coulterville Road (LM 28.3): The contractor has completed resurfacing and will begin working on final cleanup. Intermittent lane closures maybe required to complete. Construction signs will remain until all work has been completed.
[Wright Brothers Construction Company, Inc./Chattanooga West/CNY098]
HAMILTON COUNTY SR-317 (Apison Pike) improvement project from SR-321 (Ooltewah-Ringgold Road) to east of Layton Lane: Lane closures and flagging operations will be required on SR-317, Apison Pike, for bridge and grading work. The flagging operations will be performed on 11/14/24, 11/15/24, 11/18/24, 11/19/24, and 11/20/24 from 7 AM to 1 PM and 3 PM to 7 PM. Closures will last about 2 hours per location. The contractor will have intermittent flagging operations during daytime non-peak hours for bridge work, delivery of materials and equipment.
[Wright Brothers Construction Company, Inc./Chattanooga East/CNT336]
HAMILTON COUNTY SR-319 (Hixon Pike) miscellaneous safety improvements from Boy Scout Road (LM 8.5) to Thrasher Pike (LM 9.5): The contractor will be retrofitting curb ramps throughout the project limits. Daily right lane closures between 8 AM and 5 PM will be utilized to accomplish this work. Motorists should use caution as workers will be present.
[J. M. Hanner Construction Co., Inc./Chattanooga West/CNY109]
HAMILTON COUNTY SR-58 resurfacing from SR-153 (LM 4.6) to near Eller Road (LM 6.5): Resurfacing operations have been completed. The contractor will begin working on final cleanup. Intermittent lane closures maybe required to complete this work. Construction signs will remain until all work is complete.
[Wright Brothers Construction Company, Inc./Chattanooga West/CNY057]
HAMILTON COUNTY SR-8 (US-127) construction near Palisades Road (LM 15.2) to near Sunset Drive (LM 15.4): The contractor completed the slope remediation work. Minor road repairs are required, and signs will remain until this work is completed.
[Wright Brothers Construction Company, Inc./Chattanooga West/CNW001]
MCMINN COUNTY SR-163 resurfacing from I-75 (LM 0.0) to near SR-2 (LM 2.4): During this reporting period, the contractor is scheduled to work on punch-list items on SR-163. Intermittent flagging operations may be necessary. Motorists are advised to use caution in the work zone and watch for flaggers assisting with traffic control.
[Rogers Group, Inc./Cleveland/CNY125]
MCMINN COUNTY SR-309 resurfacing from SR-2 (LM 0) to Near I-75 (LM 2.25): During this reporting period, the contractor is scheduled to work on punch list items on SR-309. Flagging operations will be necessary during work. Motorists are advised to use caution in the work zone and watch for flaggers assisting with traffic control.
[Rogers Group, Inc./Cleveland/CNY125]
MCMINN COUNTY SR-39 emergency sinkhole repairs at two locations near LM 4.2: During this reporting period the contractor will be continue roadway repair work on SR-39. SR-39 will remain closed near LM 4.20 for the duration of this project.
[Talley Construction Company, Inc./Cleveland/CNY309]
MEIGS COUNTY SR-60 construction of a small drainage structure (L.M. 1.6): The culvert replacement has been completed and the long-term lane closure has been removed. Motorists should still use caution as the contractor completes cleanup, intermittent flagging operations are possible.
[Wright Brothers Construction Company, Inc./Chattanooga West/CNX408]
POLK COUNTY SR-68 construction of bridge over Brush Creek (LM 16.4): During this update period, the contractor will continue grading and bridge construction on the East side of SR-68. A temporary traffic signal system is active on SR-68 near LM 16.4. The northbound lane of SR-68 will be closed in the area controlled by the temporary traffic signal system. Motorists are advised to reduce speed and use caution in the work zone.
[Wright Brothers Construction Company, Inc./Cleveland/CNX347]
RHEA COUNTY SR-29 (US-27) resurfacing from north of Payne Lane (LM 11) to near Bradley Street (L.M. 14.6): The contractor has finished the resurfacing work and has some minor cleanup. Intermittent temporary lane closures are possible to complete the work.
[Rogers Group, Inc./Chattanooga West/CNX219]