BRADLEY COUNTY SR-2 (US-11) resurfacing from Old Highway 11(LM 18.2) to near the Hiwassee River (LM 20.9): During this reporting period, the contractor will have daily lane closures on SR-2 (US-11) to perform final pavement markings and to work on the punch list. These closures will be in place from 8 AM to 5:30 PM. Motorists are advised to reduce speed in the work zone and watch for flaggers assisting with traffic control.
[Wright Brothers Construction Company, Inc./Wagner/CNW158]
BRADLEY COUNTY SR-60 widening from the 4-lane north of I-75 (LM 17.2) to SR-306 (LM19.9): During this reporting period the contractor will have short term intermittent lane closures throughout the project for utility relocation and moving equipment as work continues on new roadway alignments and a new bridge over Candies Creek. The speed limit in the work zone has been reduced to 35 mph. Motorists are advised to use caution in the work zone and watch for flaggers assisting with traffic control.
[Summers-Taylor, Inc./Wagner/CNV130]
HAMILTON COUNTY I-24 interchange improvement at SR-2 (US-11, US-41, US-72, Broad Street) and SR-58 (Market Street): Williams Street is closed to all traffic at the I-24 underpass to support the installation of new storm drainage structures for the new frontage road. Traffic will still be able to access the ramps to I-24 and US-27, but no through traffic will be allowed on Williams Street between West 21st Street and West 25th Street. Traffic will detour around the closure via West 21st Street and Broad Street. Signs will be posted. The contractor will be working on new bridge construction, storm drainage structures, and utility relocation. Chestnut Street is closed at the I-24 underpass and will remain closed until the construction of bridge #2 is complete. Detour routes are posted. The US-27 NB On-Ramp at William St. has been closed and it will be closed until the new alignment for this ramp is completed. There will be marked detour signs to use the Broad St. US-27 on-ramp. The contractor has opened up the new Broad St Exit off I24 and closed the existing Exit to the Broad St that is off the US27 SB Exit. Traffic from US27 SB that needs to get to Broad ST. will have to use the Williams St. Exit. There will be Detour signs to direct traffic off the Williams St. Exit to Broad St. Also, with the new Exit there will be a new signal light at the intersection of the new Exit and Broad St. With the new traffic pattern, the motoring public needs to be aware of the changes. On Thursday night from 9 PM-6 AM, the contractor will be closing 1 lane on the US27 SB exit to I24 Eastbound to install barrier rail on the shoulder of this exit. Also, during this reporting period, there will be shoulder closure on the new Exit.
[Wright Brothers Construction Company, Inc./Curtis/CNU011]
HAMILTON COUNTY I-75 concrete repair from MM 6.6 to MM 12.8: During this reporting period, the contractor will be having lane closures in both directions on I-75 from 9 PM-6 AM. During these lane closures, the contractor might have to temporary close some of the ramps so that they can work on the ramp.
[Summers-Taylor, Inc./Curtis/CNW046]
HAMILTON COUNTY I-75 concrete repair from MM 6.6 to MM 12.8: During this reporting period, the contractor will be having lane closures in both directions on I-75 from 9 PM-6 AM. During these lane closures, the contractor MARION COUNTY I-24 (US-64) rockfall mitigation westbound between MM 136.2 and MM 140.3: The contractor will be working on I-24 WB at MM 141 – 140, MM 139.0 – 137.0, and MM 136.0 – 135.0 to perform rockfall mitigation activities. Travel lanes at all sites have been shifted and are open to traffic. Please use caution when traveling through the work zones.
[Wright Brothers Construction Company, Inc./Voiles/CNV912]
MARION COUNTY I-24 resurfacing from west of Martin Springs Road Exit (MM 141) to east of Big Fiery Gizzard Creek (MM 146): The contractor will be performing painting operations on I-24 from MM 140.8 (West of the Martin Springs Rd exit) to MM 146.0 (East of Fiery Gizzard Creek). Work times will be Sunday through Friday from 6 PM - 6 AM each night. Work will occur in both directions and will use a mobile lane closure or a single lane closure. Tennessee Highway Patrol and a truck mounted attenuator w/ message board will be on site each night.
[Rogers Group, Inc./Voiles/CNV314]
HAMILTON COUNTY SR-17 resurfacing from the Georgia state line (LM 0) to SR-2 (US-11, US-64, US-72, LM 2.2): During this reporting period, the contractor will have intermittent lane closures as they start working on this project.
[Talley Construction Company, Inc./Curtis/CNW213]
HAMILTON COUNTY SR-29 (US-27) slide repair between LM 29 and LM 30: During this reporting period, TDOT Maintenance and contract forces will have traffic reduced to one lane in each direction on US-27 (SR-29) to continue work on a new retaining wall and slope stabilization. Motorists are advised to reduce speed in the work zone.
[GeoStabilization International, LLC /Maint - Chattanooga/MAINT]
HAMILTON COUNTY SR-317 (Apison Pike) improvement project from SR-321 (Ooltewah-Ringgold Road) to east of Layton Lane: Lane closures and flagging operations will be required on SR-317, Apison Pike, for utility work. The flagging operations will be performed on 10/27/22, 10/28/22, 10/31/22, 11/01/22, and 11/02/22 from 7 AM to 1 PM and 3 PM to 7 PM. Closures will last about 2 hours per location. The contractor will have intermittent flagging operations during daytime non-peak hours for utility work, delivery of materials and equipment. Traffic has been shifted onto the new alignment of SR-317 by the existing intersection of Apison Pike and University Drive and by Eastview Terrace. The tie-in of College Drive to SR-317 has been closed and a detour route is in place.
[Wright Brothers Construction Company, Inc./Osbonlighter/CNT336]
HAMILTON COUNTY SR-317 (BONNY OAKS DR.) Utility Work westbound from LM 4.55 to LM 4.54: Shoulder and single lane closures from Lee Hwy and Silverdale Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, drums, and flaggers will be present, 09/22/22 through 11/02/22 from 9:00 am – 2:00 pm. [2022-475]
HAMILTON COUNTY SR-319 (AMNICOLA HWY.) Utility Work both directions from LM 1.15 to LM 2.0: THP assisted one lane reduction in both directions with a brief all stop for aerial crossing along Amnicola Hwy between the railroad bridge and DuPont Parkway. Motorists should be prepared to stop and be aware of personnel and equipment when traveling through the work zone. THP, trucks, and signage will be present, 10/30/22 from 7:00 AM to 9:00 AM, with a rain date of 11/06/22. [2021-841]
HAMILTON COUNTY SR-319 (HIXSON PK.) Utility Work both directions at LM 4.63: Mobile lane closures along Hixson Pike from SR-153 to Austin Road. Motorists should use caution and be aware of personnel and equipment when traveling through the work zone. Signage, cones, and flaggers will be present, 10/27/22 through 11/18/22 from 10:00 PM to 6:00 AM. [2022-356]
HAMILTON COUNTY SR-8 (US-127) construction near Palisades Road (LM 15.2) to near Sunset Drive (LM 15.4): The contractor has closed the right lane going up the Signal Mountain Road from LM 15 (about 1/2 Mi from Palisades Road) to past Sunset Drive. This closure will be in effect for several months during the duration of this project. Also, there will several intermittent lane closures daily on SR8 (Signal Mountain Road) as the contractor is working on removing brush on this project for the next couple of weeks.
[Wright Brothers Construction Company, Inc./Curtis/CNW001]
HAMILTON COUNTY The construction of an S.I.A. to VW: The contractor will be performing resurfacing operations starting 10/20/2022 throughout the intersection connecting the S.I.A. route, Ferdinand Piech Way, & Volkswagen Dr. The new 4-way signalized intersection will continue to operatorial & traffic has been shifted to the new alignment. Traveling public should be cautious of the new traffic pattern and lane shifts in effect including a lowered speed limit. The traveling public should also be alert to the entrance and exit of construction vehicles & staff on and around the jobsite and the connecting roadways. Flaggers may be onsite directing traffic.
[Talley Construction Company, Inc./Osbonlighter/CNU221]
MARION COUNTY SR-2 (US-64, U.S 72, US-41) resurfacing from west of Spangler Road (LM 17.4) to east of Marion County Park Road (LM 20.7): During the daytime, the contractor will be resurfacing and performing safety improvements on SR-2 in Marion County from LM 17.4 (near Spangler Rd) to LM 20.7 (near Marion County Park Rd). Traffic will be reduced to one lane controlled by flaggers. Please use caution when driving through the work zone.
[Talley Construction Company, Inc./Voiles/CNW222]
MARION COUNTY SR-2 (US-HWY. 41) TDOT Maintenance both directions from LM 25.7 to LM 26.2: A temporary traffic signal is in place for final paving and grading work being done near a landslide repair.
MARION COUNTY SR-27 between LM 26.9 and LM 27.9 slide repair and bridge and retaining wall construction: The contractor will be working on SR-27 (Suck Creek Road) at LM 26.9 and LM 27.9 to construct a new bridge and repair a slide. Both work zones, at LM 26.9 and LM 27.9, have the travel lanes reduced to one lane controlled by temporary traffic lights. Please use caution when traveling through each work zone.
[Dement Construction Company, LLC/Voiles/CNV307]
MARION COUNTY SR-27 resurfacing from near Ketner Mill Lane (LM 12.5) to near Bailey Lane (LM 16.6): During the daytime, the contractor will be resurfacing and performing safety improvements on SR-27 in Marion County. The work will begin at LM 12.5 (near Ketner Mill Lane) and go to LM 16.6 (near Bailey Lane). Traffic will be reduced to one lane controlled by flaggers. Please use caution when driving through the work zone.
[Tinsley Asphalt, LLC /Voiles/CNW185]
MARION COUNTY SR-283 (ALVIN YORK HWY.) Utility Work southbound from LM 6.37 to LM 7.32: Mobile lane closures along SR-283 between Pickett Cemetery Road and Panorama Trail. Motorists should reduce speed and be prepared to stop. Trucks, signage, cones, and flaggers will be present, 09/19/22 through 12/31/22 from 8:00 am – 5:00 pm. [2022-395]
POLK COUNTY SR-33 (US-411) resurfacing from the Georgia state line (LM 0.0) to south of Lowery Road (LM 9.3): During this reporting period, daily lane closures will be in place from 8 AM to 5:30 PM as the contractor begins work on final pavement markings. Motorists are advised to reduce speed in the work zone and watch for flaggers assisting with traffic control.
[Talley Construction Company, Inc./Wagner/CNW188]
RHEA COUNTY SR-302 (OLD DIXIE HWY.) Utility Work both directions from LM 0.01 to LM 2.5: Mobile shoulder and lane closures on SR-302 as crews transition work zones between SR-30 and Taylor Road. Motorists should reduce speed and be prepared to stop. Signage and flaggers will be present, 10/06/22 through 12/05/22 from 9:00 AM - 2:30 PM. [2022-643]