DISTRICT 28
CANNON COUNTY SR-1 (US-70S) construction from near Barker Road (LM 1.2) to east of Hoover Road (LM 2.5): Contractor may be utilizing daily lane closures through the work zone for paving operations and pavement marking. Motorists should remain vigilant of traffic control measures and use caution at the intersection of SR-64 and SR-1.
[Tinsley Asphalt, LLC /Harris/CNW348]
COFFEE COUNTY I-24 resurfacing from near Cheatem Springs Rd (MM 100.3) to SR- (US-41, MM 105.7): Construction activity will continue on this project. Work times will be Sunday through Friday from 7 PM - 6 AM each night. Work will be occurring in both directions and will close one lane at a time. Tennessee Highway Patrol and a truck mounted attenuator w/ message board will be on site each night. Speed will be controlled and reduced during work hours to 60 MPH. Motorists are encouraged to use extreme caution while traveling through the work zone and be aware of construction personnel.
[Rogers Group, Inc./Hussein/CNX020]
COFFEE COUNTY SR-2 (MURFREESBORO HWY.) Utility Work both directions at LM 5.01: Shoulder and lane closures on Murfreesboro Hwy near French Brantley Road/Noah Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 09/29/23 from 9 am - 12 pm, with a rain date of 10/03/23. [2023-417]
COFFEE COUNTY SR-53 resurfacing from north of Hideout Rd (LM 4.9) to the Cannon County line (LM 11.1): Construction activity will begin on this project. Resurfacing progress work will be implemented daily. Traffic will be temporarily slowed and may experience intermittent lane closures to support this work. Motorists should be alert to all project activity and encouraged to use caution throughout the work zone.
[Wiregrass Construction Company, Inc./Hussein/CNX242]
FRANKLIN COUNTY SR-16 (US-41A) resurfacing from south of SR-50 (LM 11.3) to SR-15 (US-64, US-41A, LM12.0): The contractor will be on site performing resurfacing operations nightly between 7PM and 6AM. Lane closures will be in place to support project work. Motorists should be alert to all project activity and encouraged to use caution throughout the work zone.
[Tinsley Asphalt, LLC /Hussein/CNX237]
GRUNDY COUNTY SR-50 resurfacing from near I-24 (LM 0.4) to near the Elk River (LM 7.0): Construction activity will continue on this project. Resurfacing progress work will be implemented daily. Traffic will be temporarily slowed and may experience intermittent lane closures to support this work. Motorists should be alert to all project activity and encouraged to use caution throughout the work zone.
[Asphalt Paving Systems, Inc./Hussein/CNX117]
GRUNDY COUNTY SR-108 at LM 3.3 construction of a concrete slab bridge and retaining walls: Construction activity will continue on this project. The Contractor will be implementing a road closure beginning 07/5/23, with detour signage in place. Detour will remain in place for the duration of project activity. Motorists are advised to be alert to all project activity and encouraged to use caution throughout the work zone. Work hours may be 24 hours daily to support Project progression.
[J. Hill Excavating, LLC/Hussein/CNX903]
MARION COUNTY I-24 (US-64) rockfall mitigation westbound between MM 136.2 and MM 140.3: The contractor will be working on I-24 WB at MM 141 – 140, MM 139.0 – 137.0, and MM 136.0 – 135.0 to perform rockfall mitigation activities. Lanes have been shifted at MM 137.5 for new rockfall mitigation work. Please use caution when driving through the work zones.
[Wright Brothers Construction Company, Inc./Voiles/CNV912]
MARION COUNTY I-24 resurfacing from the Tennessee River Bridge (MM 160) to the Georgia Stateline (MM 167): The contractor will be installing high friction surfaces on I-24 EB and WB from the Tennessee River bridge (MM 160) to the Georgia State Line (MM 167). This work will require nighttime closures from 7 PM - 6 AM each night. One lane will be shut down, leaving one lane open to traffic. Tennessee Highway Patrol and crash trucks will be on site during the work. Please use caution when traveling through the work zone.
[Talley Construction Company, Inc./Voiles/CNX122]
MARION COUNTY SR-2 (US-HWY. 41) Utility Work both directions from LM 16 to LM 18: Mobile shoulder and single lane closures from Old Chattanooga Pike and Dixon Lane/Dover Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, barrels/cones, and flaggers will be present, 06/12/23 through 10/04/23 from 9am - 2pm. [2022-733]
MARION COUNTY SR-27 (US-72) repair of bridges over Battle Creek (LM 3.9): The contractor will be repairing the bridges over Battle Creek on SR-27 at LM 3.9. Phase one traffic control has been setup and the contractor is continuing work. Please use caution when driving through the work zone.
[Mid-State Construction Company, Inc./Voiles/CNX041]
MARION COUNTY SR-27 (US-72) resurfacing from near Lock and Dam Road (LM 6.4) to near Ketner Mill Lane (LM 12.5) and on SR-156 over the CSXT railroad crossing (LM 18.6 to LM 18.8): The contractor will be performing resurfacing operations on SR-27 near Lock and Dam Rd (LM 6.4) to near Ketner Mill Lane (LM 12.5) and on SR-156 over the CSXT railroad crossing (LM 18.6 to LM 18.8). This work will require single lane closures controlled by flaggers. Please use caution when driving through the work zone.
[Tinsley Asphalt, LLC /Voiles/CNX179]
MARION COUNTY I-24 MM 153 bridge repair for SIA route serving Valmont Industries and Mueller Water Products: The contractor will be performing bridge repairs and resurfacing a State Industrial Access (SIA) serving Valmont Industries and Mueller Water Products. The contractor has shut the Kimball Lane bridge over I-24. The bridge will be shut down for approximately 3 weeks. A detour route will be setup to direct traffic. Please use caution when driving through the work zones.
[Tinsley Asphalt, LLC /Voiles/CNX258]
SEQUATCHIE COUNTY SR-283 (EAST VALLEY RD.) Utility Work both directions from LM 1.15 to LM 5.54: Mobile shoulder and lane closures between the intersection of SR-283/E. Valley Road and SR-8 and New Hope Loop as crews transition the work zone along the route. Motorists should reduce speed and be prepared to stop. Trucks, signage, and barrels/cones will be present, 08/31/23 through 01/01/24 from 9 am - 2 pm. [2023-425]
SEQUATCHIE COUNTY SR-8 resurfacing from near SR-111 (LM 30.1) to the Van Buren County line (LM 33.5): The contractor will be performing resurfacing operations on SR-8 from near SR-111 (LM 30.1) to the Van Buren County Line (33.5). This work will require single lane closures controlled by flaggers. Please use caution when driving through the work zone.
[Rogers Group, Inc./Voiles/CNX156]
VAN AND BUREN COUNTY SR-285 resurfacing from SR-30 (LM 7.3) to the Bledsoe County line (LM 16.3): Motorists should expect some delays with lane closures with resurfacing activities start. Daily lane closures and flaggers will be present on SR-285. Motorists should use caution and watch for flaggers and workers.
[Rogers Group, Inc./Harris/CNX236]
VAN BUREN COUNTY SR-30 (COLLEGE ST.) Utility Work northbound from LM 6.8 to LM 8.8: Shoulder and lane closures on College Street between Veterans Square and Sullivan Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, and barrels/cones will be present, 09/11/23 through 10/23/23 from 9 am - 2 pm. [2022-596]
VANBUREN COUNTY Scenic Loop Road resurfacing in Fall Creek Falls State Park from Lakeside Drive (LM 0.0) to the Overlook parking area (LM 1.6): The contractor will be performing resurfacing operations on the Scenic Loop Road in Fall Creek Falls State Park from Lakeside Drive (LM 0.0) to the Overlook parking area (LM 1.6). This work will require single lane closures controlled by flaggers. Please use caution when driving through the work zone.
[Tinsley Asphalt, LLC /Voiles/CNX115]
WARREN COUNTY SR-1 (US-70S) and SR-380 intersection improvement and S.I.A. to Motlow Advanced Robotics with intersection: The contractor will have intermittent lane closures and flaggers present on both SR380 and SR-1 for sidewalk and grade work. The left lanes on Westbound and Eastbound SR-1 from Omni Drive through Mall Drive will remain closed to allow the contractor to complete grade work. The left turn lane at LM 13.88 on SR-1 Westbound to SR-380/Sparta Street will remain closed off. Traffic will need to travel to traffic light to make left a turn towards Sparta Street/SR-380. Intermittent left turn lane, right lane, and center lane closures on SR-380 to shift traffic and allow the contractor to complete work in the area. Motorists should use caution, watch for flaggers, be vigilant of new traffic patterns, and expect some delays through the work zones.
[Dement Construction Company, LLC/Harris/CNW212]
WARREN COUNTY SR-1 (US-70S) from east of Griffith Ln (LM 14.8) to west of Mud Creek Road (LM 18.5) and on SR-288 from SR-1 (US-70S, LM 0) to near Collins River Dr (LM 4.8): The contractor will be utilizing daily lane closures on SR-1 and SR-288 for resurfacing activities. Daily closures of various crossovers and left turn lanes on SR-1 should be expected. Flagger will be present for lane closures on SR-288. Motorists should watch for flaggers and workers through the work zones. Motorists should use caution expect some delays during this work on SR-1 and SR-288.
[Tinsley Asphalt, LLC /Harris/CNX123]
DISTRICT 29
BRADLEY COUNTY SR-60 widening from the 4-lane north of I-75 (LM 17.2) to SR-306 (LM19.9): During this reporting period the contractor will have short term intermittent lane closures throughout the project for utility relocation and moving equipment as work continues on new roadway alignments and a new bridge over Candies Creek. Hopewell Place is closed to all traffic for reconstruction of the intersection with Georgetown Rd. Detour signs are posted. The speed limit in the work zone has been reduced to 35 mph. Motorists are advised to use caution in the work zone and watch for flaggers assisting with traffic control.
[Summers-Taylor, Inc./Cleveland/CNV130]
BRADLEY COUNTY SR-74 (OCOEE ST. N.E.) Utility Work both directions at LM 14.44: Southbound lane closure with temporary closures of the northbound and 2-way turn lane on N. Ocoee Street between 20th Street NE and 6th Street NW. Motorists should reduce speed and be prepared to stop. Trucks, signage, and barrels/cones will be present, 09/21/23 through 10/05/23 from 9 am - 2 pm. [2023-460]
HAMILTON COUNTY I-24 concrete repair from east of the I-124 (US-27) ramps (MM 179.0) to east of Long Street (MM 178.8): During this reporting period from 9 PM-6 AM, there will be nightly lane closures on I24 and the I24 WB off ramp to US27 NB. During these closures, there is the possibility that ramps might be temporarily closed. Starting at 9 PM Friday September 29 until no later than 6 AM Monday October 2, the Market St South Exit on US27 NB ramp will be closed. Also, with this ramp closed, the dedicated turn lane to this exit will be closed on US27 NB ramp from I24 WB. The Williams St and Broad St on ramps to US27 will also be closed. Drivers wanting to get to Market St. South will have to use Exit 180A, Rossville BVD to get to Market St. Traffic should expect possible long delays during this time and to find alternate routes around this area.
[Summers-Taylor, Inc./Curtis/CNX186]
HAMILTON COUNTY I-75 at I-24 Interchange Reconstruction Phase 2: There will be nightly lane closures on this project, 9 PM to 6 AM, on I-24 East and West from Germantown Road to Spring Creek Road, MM182 to MM185, for construction of the substructure for the new McBrien Road and S. Moore Road overpasses. To safely perform this work, rolling roadblocks may also be used to separate vehicles on I-24 from construction activities. Also, beginning the night of Sunday, October 1, 2023, the contractor will begin shifting traffic on I-24 East and West between Germantown Road and S. Moore Road to a new alignment. Traffic lanes will be narrowed and moved toward the center of the roadway so that construction can begin on new outside lanes. These changes will take several nights of work to fully implement. Multiple uniformed police officers will be present in these work zones to assist with traffic management and to enforce traffic laws. Intermittent daytime non-rush hour lane closures will also be necessary throughout the period on South Terrace and North Terrace between Germantown Road and Belvoir Avenue to work on street lighting and various other construction items. All work is weather permitting. Moore Road and McBrien Road bridges over I-24 are closed as well as the entrance and exit ramps to I-24 between Belvoir Avenue and Moore Road. A continuous flow detour using Belvoir Avenue and Spring Creek Road is in place for local traffic. The closures and detour will be in place for approximately 11 months. RESTRICTIONS: Moore Road and McBrien Road over I-24 closed. I-24 Ramps between Belvoir and Moore Road closed.
[Wright Brothers Construction Company, Inc./Maj Prj - Blevins/DB2101]
HAMILTON COUNTY SR-312 (BIRCHWOOD PK.) Utility Work eastbound at LM 1.07: Shoulder and lane closures on Birchwood Pike between Sam Smith Road and SR-60. Motorists should reduce speed and be prepared to stop. Trucks, signage, and barrels/cones will be present, 09/27/23 through 09/29/23 from 9 am - 12 pm. [2023-532]
HAMILTON COUNTY SR-321 (OOLTEWAH-RINGGOLD RD.) Utility Work southbound at LM 0.98: Shoulder and lane closures on Ooltewah Ringgold Road between Frost Creek Drive and E. Brainerd Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, and barrels/cones will be present, 09/28/23 through 09/29/23 from 9 am - 2 pm. [2023-541]
HAMILTON COUNTY SR-29 (US-27) resurfacing from Morrison Springs Road (LM 6.1) to SR-153 (LM 11.6): During this reporting period from 7 PM-6 AM, there will be lane closures on US27(SR29) in both Northbound and Southbound directions as the contractor starts work on this project. The motoring public should expect possible delays during this time.
[Wright Brothers Construction Company, Inc./Curtis/CNX238]
HAMILTON COUNTY SR-317 (Apison Pike) improvement project from SR-321 (Ooltewah-Ringgold Road) to east of Layton Lane: Lane closures and flagging operations will be required on SR-317, Apison Pike, for utility and grading work. The flagging operations will be performed on 09/28/23, 09/29/23, 10/02/23, 10/03/23 and 10/04/23 from 7 AM to 1 PM and 3 PM to 7 PM. Closures will last about 2 hours per location. The contractor will have intermittent flagging operations during daytime non-peak hours for utility work, delivery of materials and equipment. The contractor will also have intermittent flagging operations at Bess Moore Road and Layton Lane for grading work and storm drainage installation.
[Wright Brothers Construction Company, Inc./Chattanooga/CNT336]
HAMILTON COUNTY SR-8 (US-127) construction near Palisades Road (LM 15.2) to near Sunset Drive (LM 15.4): The contractor has closed the right lane going up the Signal Mountain Road from LM 15 (about 1/2 Mi from Palisades Road) to past Sunset Drive. This closure will be in effect for several months during the duration of this project. There will be intermittent lane closures on Signal Mountain Road as the contractor will have flaggers out as they work. Due to the possibility of flaggers stopping traffic, traffic should be aware of possible delays in this area.
[Wright Brothers Construction Company, Inc./Curtis/CNW001]
HAMILTON COUNTY SR-8 (US-41, US-76) Bachman Tubes cleaning: On Thursday Night of this reporting period, the contractor will be shutting down the tunnels from 8 PM-6 AM to clean it. There will be a signed detour for traffic to follow to get around the closure.
[Diamond Specialized, Inc./Curtis/CNX190]
HAMILTON COUNTY SR-8 construction of pedestrian facilities from West 13th St (LM 8.5) to East 4th St (LM9.4): During this reporting period, the contractor will have intermittent lane closures on the project as they work on Removing existing Curb ramps and replacing them.
[Talley Construction Company, Inc./Curtis/CNX116]
MCMINN COUNTY SR-39 construction of a bridge over Middle Creek (LM 13.4): During this reporting period, the Northbound and Southbound traffic will be reduced to one lane and controlled by traffic signals. County road 567 will be closed to traffic (LOCAL TRAFFIC ONLY) and detoured to SR039. This closure is necessary to perform the bridge replacement. The lane restriction will remain in place until the bridge replacement is completed.
[Whaley Construction, LLC/Chattanooga/CNX069]
MEIGS COUNTY SR-58 (STATE HWY. 58) Utility Work both directions from LM 15 to LM 9: Intermittent lane closures on SR-58 between Burkett Chapel Road and Blank Road/Sneed Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 08/24/23 through 12/14/23 from 8 am - 5 pm. [2022-366]
MEIGS COUNTY SR-304 resurfacing from SR-58 (LM 0.0) to SR-68 (LM 8.8): During this reporting period, daily lane closures are possible between 8 AM and 7 PM as the contractor begins this work. Motorists are advised to reduce speed in the work zone and watch for flaggers assisting with traffic control.
[Rogers Group, Inc./Chattanooga/CNX243]
MEIGS COUNTY SR-58 at SR-68 (LM 26.9) construction of a roundabout, and safety improvements on SR-58 near Nebo Road (LM 29.2): During this period, the contractor will be performing grading operations for construction of a new roundabout. Intermittent lane closures are possible on SR-58 and SR-68 from 8 AM to 6 PM as work is performed. Motorists are advised to reduce speed in the work zone and watch for flaggers assisting with traffic control.
[Talley Construction Company, Inc./Cleveland/CNX073]
MEIGS COUNTY The miscellaneous safety improvements on various local roads: Safety improvements on Lamontville Road (Local Route 00947), Cottonport Road (Local Route 01189). The contractor will be working on site intermittently over the next few weeks. During this work, flaggers will be used, and a lane closure will be in place. Motorists are encouraged to use caution as they approach the work zone.
[Superior Traffic Control, LLC/Inc./Chattanooga/CNX263]
MEIGS AND MCMINN COUNTY SR-305 resurfacing from near I-75 (LM 4.9) in McMinn County to south of SR-68 (LM 1.3) in Meigs County: During this reporting period the contractor will be resurfacing SR305. Daily lane closures will be in place from 8 AM to 6 PM as this work occurs. Motorists are advised to reduce speed in the work zone and watch for flaggers assisting with traffic control.
[Rogers Group, Inc./Cleveland/CNX245]
POLK COUNTY SR-68 repair of the bridge over the Hiwassee River (LM 4.8): During this reporting period, the contractor will continue work on bridge repairs to the SR-68 bridge over the Hiwassee River. A temporary traffic signal system has been installed to reduce traffic to a single lane on the bridge over the Hiwassee River. Motorists are advised to reduce speed in the work zone and watch for flaggers assisting with traffic control.
[Mid-State Construction Company, Inc./Cleveland/CNX040]
REGION WIDE
REGION 2 preventative and unscheduled maintenance of Chattanooga SmartWay Intelligent Transportation System: REGION 2 preventative and unscheduled maintenance of Chattanooga SmartWay Intelligent Transportation System: The contractor may have short term shoulder and/or lane closures to perform preventative or unscheduled maintenance to the local SmartWay Intelligent Transportation System. At least one travel lane will always remain open to traffic. Flaggers will assist with traffic control as needed. [Lumin8, Inc./Chattanooga/CNX270]
[Lumin8 Transportation Technologies, LLC/Chattanooga/CNX270]
REGION 2 The crack sealing at various locations on various State Routes: The crack sealing at various locations on various state routes. Motorists should be alert to all project activity and encouraged to use caution throughout the work zone.
[Scodeller Construction, Inc./Hussein/CNX230]
REGION 2 The drain cleaning on various Interstate and State Routes: During this reporting period from Sunday thru Thursday night from 8 PM-6 AM the contractor will have 1 lane closed on I75 from MM 2- MM18 as they work to clean various drains in this area. If they get finished in this area, they will move to I24, SR153 and SR111 to clean those drains.
[Blevins Enterprises, Inc./Curtis/CNW335]
REGION 2 The installation of longitudinal cable barrier on various Interstate Routes: The contractor may have short term shoulder closures on I-75, I-24, and I-40 in order to perform cable rail installation. Both travel lanes will always remain open to traffic on the interstate during any work that is performed.
[R.D. Construction, LLC/Harris/CNW374]
REGION 2 The on-call guardrail repair and new guardrail installation on various Interstate and State Routes: The contractor may have short term shoulder and/or lane closures in order to perform guardrail repair. These closures will take place on the interstate nightly Sunday through Thursday from 7 PM to 6 AM and daily Monday through Friday on state routes. At least one travel lane will remain open to traffic at all times on the interstate, and flaggers will be present on state routes during any work that is performed.
[Cumberland Guardrail, Inc./Harris/CNX096]
REGION 2 The random on-call cable barrier repair on various Interstate and State Routes: The contractor may have short term shoulder closures in order to perform cable rail repair. Both travel lanes will always remain open to traffic on the interstate during any work that is performed.
[Tennessee Guardrail, Inc./Harris/cnw283]
REGION 2 The random on-call pavement marking and retracing of pavement markings with spray thermoplastic on various Interstate and State Routes: The contractor will be on site in Hamilton County on SR-29, SR-58, SR-17, and SR-2 weather permitting to perform retracing operations. A mobile operation will be used to facilitate this work and brief lane closures may be necessary. Motorists are encouraged to use caution when workers are present.
[Reynolds Sealing and Striping, Inc./Moore/CNX052]
REGION 2 The relensing of snowplowable pavement markers on various Interstate and State Routes: Contractor is expected to start replacing lenses on snowplowable markers in Van Buren, Grundy, Sequatchie, and Warren Counties. The contractor will be performing a mobile operation, which as a result will lead to slower travel speeds. Motorists are strongly encouraged to use caution when workers are present.
[W.L. Markers Inc./Moore/CNX047]
REGION 2 The sweeping on various Interstate and State Routes: There will be an area wide sweeping operation on selected regional state routes and interstates. This activity will be supported by a mobile lane closure. Hours of activity are Sunday through Thursday night between 8 PM and 6 AM during this reporting period.
[Blevins Enterprises, Inc./Curtis/CNW334]
RESTRICTIONS
PUTNAM COUNTY - CNX244: Wide loads should seek alternate route due to narrow lane widths.
HAMILTON COUNTY - DB2101: Moore Road and McBrien Road over I-24 closed. I-24 Ramps between Belvoir and Moore Road closed.