Weekly Road Construction Report

Thursday, January 28, 2021

Here is the weekly road construction report for District 29:

BRADLEY COUNTY Utility Work on SR-2 (S. LEE HWY.) northbound from LM 8.21 to LM 8.44: Center lane closure between Victory Street SW and Golf Drive SW. Signage, flaggers and cones will be present. Motorists should use caution through the area and be aware of personnel and equipment between 8 PM and 6 AM with an estimated completion 02/18/21.

 

BRADLEY COUNTY Utility Work on SR-74 (OCOEE ST. N.E.) both directions from LM 16.26 to LM 16.88: Shoulder and single lane closure between Westview Drive NW and Keith Street NW. Signage and cones will be present. Motorists should use caution through the area and be aware of personnel and equipment between 9 AM and 3 PM with an estimated completion 02/28/21.

 

BRADLEY COUNTY SR-60 construction of small drainage structures (LM 15.85 and LM 15.9): Work on this project is complete pending punchlist. The contractor may have intermittent closures of the right northbound shoulder of SR-60 to work on the punchlist. Motorists are advised to use caution entering the shopping center at the intersection of 25th Street and Keith Street.

[Whaley Construction, LLC/Wagner/CNU227]

 

HAMILTON COUNTY SR-319 repair of the bridge over the Tennessee River and Riverpark Drive (LM 2.2): The contractor will be performing repair operations to the bridge that will require lane closures in both directions. Extra caution should be observed of trucks entering and exiting the work-zone. During this report period the contractor will have temporary lane closures in each direction. Additional flaggers will be present as needed.

[Mid-State Construction Company, Inc./Osbonlighter/CNU205]

 

HAMILTON COUNTY I-24 Replacement of Belvoir Ave. bridge over I-24 and I-24 bridges over Germantown Road near MM 183: Lane shifts and single lane closures are in place at North and South Terrace approaching the Belvoir Avenue Bridge. Single alternating lane closures on I-24 EB and WB will be used on 01/28/21, and 01/31/21 through 02/03/21 from 9 PM and 6 AM. Additionally, there will be single lane closures in the north and south directions of Germantown Road under the I-24 Bridge and at the intersections of Germantown with North and South Terrace. These closures will occur on 01/28/21 and 01/29/21, and between 01/01/21 and 02/03/21 from 9 AM to 6 AM the following morning. Motorists should be aware of the Belvoir Avenue Bridge closure and detour that was put into place on 04/20/20. There is a 45 MPH speed limit reduction throughout the project corridor on I-24.

[Bell and Associates Construction, LP/Blevins/CMGC03]

 

HAMILTON COUNTY I-75 at I-24 Interchange Reconstruction: Phase 2 traffic alignments have been implemented. Watch for trucks entering and exiting project. Traffic should expect multiple lane shifts traveling through the interchange. Lane closures will occur Sunday nights through Thursday nights between 9 PM and 6 AM at the following locations: I-75 NB MM 1, I-75 SB MM 3 and I-24 EB MM 184.0 Traffic pacing may occur throughout interchange Sunday nights through Thursday nights between 9 PM and 6 AM. Additionally, there may intermittent shoulder closures at various locations for access to the median and roadside areas. I-75 NB to I-24 WB split has been moved back 1500 feet from its previous location. Welcome Center traffic intending to use I-24 WB now, will have to detour on I-75 NB to Exit 3. Detailed detour information will be available at the Welcome Center. The speed limit has been reduced to 45 MPH throughout the interchange. ***TRAFFIC SHIFT on 02-01-2021, I-75 SB will be shifted after 9 PM near the interchange to accommodate shoulder work.

[C.W. Matthews Contracting Company, Inc./Blevins/DB1801]

 

HAMILTON COUNTY US-27 (I-124) widening from I-24/US-27 interchange to north of the Olgiati Bridge over the Tennessee River, including widening the Olgiati Bridge: Work on this project continues with activities occurring in the median and shoulders of US-27. Motorists should be alert for construction vehicles entering and exiting the activity area. Motorists should pay close attention to the detour signage posted. The speed limit on US-27 in the construction zone remains 45 MPH. Weather permitting, the contractor may implement temporary lane/shoulder closures on weeknights between the hours of 7 PM and 6 AM. At least one lane will remain open in each direction on US-27. Note: Monday thru Friday from 6 AM to 7 PM a minimum of two lanes will remain open both northbound and southbound on US-27. Monday thru Friday from 7 PM to 6 AM and Saturday and Sunday from 6 AM to 7 PM a minimum of one lane will remain open both northbound and southbound on US-27. Thursday 01/28/21 thru Wednesday 02/03/21 from 7 AM to 6 PM and 7 PM to 6 AM, temporary lane closures will be in place for southbound and northbound US-27 from the Olgiati Bridge to I-24 for median work, striping, and painting operations. Saturday 01/30/21 and Sunday 01/31/21 from 8 AM to 8 PM, temporary double right lane closures will be in place for southbound and northbound US-27 from the Olgiati Bridge to I-24 for striping operations. Friday 01/29/21 thru Sunday 01/31/21 from 7 PM to 8 PM, temporary lane closures will be utilized for west bound M.L. King Blvd. traffic. Traffic will be shifted to one lane for west bound traffic for crosswalk construction. State Trooper requested on Saturday 01/30/21 and Sunday 01/31/21for striping operations. RESTRICTIONS: I-124 (US-27) Northbound Exit 1C 4th Street Off Ramp No oversize/over dimensional loads. I-124 (US-27) Southbound Exit 1A – 1B Martin Luther King Blvd Off Ramp No oversize/over dimensional loads I-124 (US-27) Southbound on Ramps from Martin Luther King Blvd No oversize/over dimensional loads.

[Dement Construction Company, LLC/Micka/CNP230]

 

HAMILTON COUNTY TDOT Maintenance on I-24 both directions from MM 171 to MM 185: Litter pick up in median and on both sides of the interstate Monday through Saturday.

 

HAMILTON COUNTY Utility Work on SR-148 (LOOKOUT MTN. SCENIC HWY.) southbound at LM 0.10: Shoulder and single lane closure between Lula Lake Road and TN-GA State Line. There will be temporary red lights to assist with the closure, as well as signage and cones. Motorists should use caution through the area and be aware of personnel and equipment between 9 AM and 3 PM from 12/15/20 through 02/28/21.

 

HAMILTON COUNTY Utility Work on SR-153 (STATE HWY. 153) both directions from LM 0 to LM 4.0: Rolling roadblock between I-75 and SR-153 to SR-58 (Amnicola Hwy). Traffic control trucks, message trucks, and signage will be present. Motorists should use caution through the area and be aware of personnel and equipment between 4 AM and 5 AM on 01/31/21.

 

HAMILTON COUNTY Utility Work on SR-2 (LEE HWY.) both directions from LM 17.12 to LM 17.12: Shoulder and single lane closure between Hwy 153 to Dupre Road. Signage and cones will be present. Motorists should use caution through the area and be aware of personnel and equipment between 9 AM and 2 PM starting 02/01/20 through 02/05/21.

 

HAMILTON COUNTY SR-29 (US-27) repair of the bridge over Big Soddy Creek (LM 20.6): The contractor will be performing bridge & roadway repair on the SR-29 bridge over Big Soddy Creek. During this report period the contractor will have traffic restricted with two lanes of SR-111 southbound closed. Also, during this report period, the contractor will have two lanes of SR-29 north-bound closed. At least one lane of traffic in both directions shall always remain open.

[Mid-State Construction Company, Inc./Osbonlighter/CNU046]

 

HAMILTON COUNTY SR-2 (US-64, US-11) improvement of the intersection at Edgmon Road in Collegedale (LM 22.7), including grading, drainage and paving: During this report period, the contractor will be performing grading, drainage and paving. Extra care should be taken while trucks and heavy equipment are entering and exiting the roadway. The roadway may be temporarily restricted to a one lane roadway by flagging operation.

[Talley Construction Company, Inc./Osbonlighter/CNU012]

 

HAMILTON COUNTY SR-317 (Apison Pike) improvement project from SR-321 (Ooltewah-Ringgold Road) to east of Layton Lane: Lane closures and flagging operations will be required on SR-317, Apison Pike, to install power poles and transfer lines. The flagging operations will be performed on 01/28/21, 02/01/2021, 02/02/2021, and 02/03/2021 from 7 AM to 1 PM and 3 PM to 7 PM. Closures will last about 2 hours per location. Eastview Terrace will also have short closures to connect driveways to the new roadway. There will also be very short lane closures for blasting that will last five minutes or less. The contractor will have intermittent flagging operations during daytime non-peak hours for utility work, delivery of materials and equipment.

[Wright Brothers Construction Company, Inc./Osbonlighter/CNT336]

 

HAMILTON COUNTY The construction of an S.I.A. to VW: The contractor will be grading, paving, constructing retaining wall(s) and installing signals & lighting on S.I.A. route connecting Ferdinand Piech Way & Volkswagen Dr. The roadway is not open to traffic. The traveling public should be alert to the entrance and exit of construction vehicles from the jobsite onto the connecting roadways. Flaggers will be onsite directing traffic.

[Talley Construction Company, Inc./Osbonlighter/CNU221]

 

POLK COUNTY Utility Work on SR-33 (HWY. 411) both directions from LM 9.9 to LM 14: Mobile lane closures SR-40 junction to Ocoee River Bridge as crews transition work zone. Motorists should use caution and be aware of personnel and equipment when traveling through the work zones. Signage, cones, and flaggers will be present between 9 AM to 3 PM with an estimated completion of 03/31/21.

 

POLK COUNTY SR-40 (US-64) bridge over the Ocoee River: During this reporting period, the contractor will be working on foundations for the new bridge over the Ocoee River. The right westbound shoulder of SR-40 (US-64) will be closed for the duration of this work. Motorists are advised to reduce speed and to watch for trucks entering/leaving the highway in the work zone.

[Charles Blalock and Sons, Inc./Wagner/DB1802]

 

POLK COUNTY SR-40 (US-64) emergency slope stabilization near LM 20.5: During this reporting period, the contractor will be hauling rock fill into the slide area. The eastbound truck climbing lane on SR-40 (US-64) at LM 20.5 is closed and will remain closed for the duration of construction. Motorists are advised to reduce speed in the work zone and watch for trucks entering/leaving the highway.

[Wright Brothers Construction Company, Inc./Wagner/CNU909]

 

RHEA COUNTY The grading, drainage, construction of bridges, paving and signals on a S.I.A. route serving Nokian Tyres: Construction activity at the Nokian Tyres SIA project continues just North of Dayton, TN. The travelling public should be alert to construction vehicles entering and exiting the site. SR-29 traffic will continue to experience slight lane shifts with no shoulders at the entrance to the SIA roadway but there will be no lane closures on SR29.

[Dement Construction Company, LLC/Micka/CNU014]


Weekly Road Construction Report

W. 3rd And Chestnut Street Construction Closure Begins Sept. 27

Hunter Museum Hosts Virtual Art Wise Events


Here is the weekly road construction report for District 29: BRADLEY COUNTY I-75 resurfacing from north of SR-60 (MM 25) to south of SR-308 (MM 31): During this reporting period, the contractor ... (click for more)

The intersection of Chestnut Street at 3rd Street will be closed beginning Monday at noon for a four-week duration. This closure is in preparation for the upcoming milling and paving of Chestnut ... (click for more)

Hunter Museum of American Art is hosting virtual Art Wise events. Virtual Art Wise with Lalla Essaydi will be Thursday from 6-7 p.m. Artist Lalla Essaydi will share her work, process, artistic ... (click for more)



Happenings

Weekly Road Construction Report

Here is the weekly road construction report for District 29: BRADLEY COUNTY I-75 resurfacing from north of SR-60 (MM 25) to south of SR-308 (MM 31): During this reporting period, the contractor will have nightly lane closures beginning at 7 PM and ending at 6 AM to support resurfacing operations between Exits 25 and 33. The contractor will also have shoulder closures in place ... (click for more)

W. 3rd And Chestnut Street Construction Closure Begins Sept. 27

The intersection of Chestnut Street at 3rd Street will be closed beginning Monday at noon for a four-week duration. This closure is in preparation for the upcoming milling and paving of Chestnut Street, which requires the stabilization of the intersection prior to paving. The estimated time frame, weather permitting is as follows: Week 1: Demolition of all brick, crosswalks ... (click for more)

Breaking News

Jury Deliberates 13 Hours With No Verdict Yet In Janet Hinds Case; To Resume Saturday Morning

The Nashville jurors in the Janet Hinds case deliberated 13 hours on Friday before stopping for the night. The panel was to resume talks at 9 a.m. on Saturday. Jurors reported making good progress an hour before they were dismissed for the night by Judge Don Poole. But they returned an hour later still without a verdict. Ms. Hinds is charged in the February 2019 traffic ... (click for more)

6 Juveniles Arrested For Theft And Shooting Of K9 Joker To Be Detained Until Hearing

Six juveniles (ages 13-17 years old), who were arrested for their criminal involvement in auto burglaries and shooting of BCSO K9 Joker, attended an arraignment hearing on Friday. They were ordered to be held at the Bradley County Juvenile Detention Center until their detention hearing next Thursday. Prior to their arraignment, the Cleveland Police Department charged them ... (click for more)

Opinion

Why Is All The New Building Not Saving Us From A 40-Cent City Property Tax Increase? - And Response

With the number of homes, apartments and condos built downtown, why is a 40 percent property tax increase necessary? Are these new structures on the paying property tax role? I need to know what’s going on downtown and why isn’t that money benefiting the city? Georgia Vaughn * * * The answer is that tax exemptions for these projects have been given out freely and ... (click for more)

Roy Exum: The Degradation Of Nurses

Debbie Moore-Black, is a registered nurse whose blogs regularly appear on the medical news website, KevinMD.com. With the unearthly demands of COVID and historic lack of concern for the nursing populace, she wrote this week on the degradation and the devaluation of the nation’s nursing force. Perhaps we should all listen: * * * TIME WILL TELL IF LESSONS WILL BE LEARNED ... (click for more)