Weekly Road Construction Report

Thursday, April 18, 2019

Here is the weekly road construction report for Hamilton County:

I-75 at I-24 Interchange Reconstruction: Crews will continue surveying and spotting utilities at various locations throughout the interchange. Shoulders may be closed at these locations between 9 a.m.-3 p.m. Additionally, the following lane closures will occur during this period: Monday from 10:30 p.m.-6 a.m. - Single right lane closure on I-75 NB to I-24 WB ramp and single left lane closure on I-24 EB, Tuesday from 10:30 p.m.-6 a.m. - Single left lane closure on I-75 NB to I-24 WB ramp, Wednesday from 10:30 p.m.-6 a.m. - Single right lane closure on I-75 SB to I-24 WB ramp (just before Spring Creek Road bridge).  [C.W. Matthews Contracting Company, Inc./Pruett/DB1801] 

US-27 (I-124) Widening from I-24/US-27 interchange to north of the Olgiati Bridge over the Tennessee River, including widening the Olgiati Bridge: Work on this project continues with activities occurring on the west side of southbound US-27. Motorists should be alert for construction vehicles entering and exiting the area along the access ramps for east and westbound M. L. King Boulevard. The speed limit for the access ramp is 35 MPH. The 12th Street tie-in ramp to US-27 South has been temporarily closed. This closure will be in place until further notice. Additionally, the southbound ramp from W. Main Street to southbound US-27 has been temporarily closed and will remain so until further notice. Detours are posted. Motorists should pay close attention to the detour signage posted. The speed limit on US-27 in the construction zone remains 45 MPH. Weather permitting; the contractor may implement temporary lane/shoulder closures on weeknights between the hours of 7 p.m.-6 a.m. At least one lane will remain open in each direction on US-27. Wednesday night from 7 p.m.-6 a.m. The contractor will perform a temporary double right lane closure on southbound Olgiati Bridge then a single right lane closure past the W. 4th St. exit. This closure will be in place for southbound US27 from the Olgiati Bridge to the Martin Luther King Blvd Bridge for staging of bridge beams. Additionally, the southbound US27 Exits 1A-B will be temporarily closed for Setting Beams over Martin Luther King Boulevard. All traffic into town will need to use the southbound US27 exit to 4th Street. Traffic will then be detoured to Broad Street to Martin Luther King Boulevard. The right lane in each direction on Martin Luther King Boulevard will be closed. The Westbound Martin Luther King Boulevard on ramp to southbound US27 will be closed – traffic will be detoured to Gateway Ave / 6th Street / Chestnut / 4th Street to US27 Southbound. All other on ramps will remain open. Restrictions: I-124 (US-27)Northbound Exit 1C 4th St Off Ramp: No oversize/over dimensional loads; I-124 (US-27) Southbound Exit 1A-B Martin Luther King Blvd. Off Ramp: No oversized/over dimensional loads; I-124 (US-27) Southbound On Ramps from Martin Luther King Boulevard: No oversized/over dimensional loads  Estimated project completion date is January 2020. [Dement Construction Company, LLC/Micka/CNP230]

TDOT Maintenance on SR-319 (Dupont Parkway) northbound at LM 2.67: Region 2 Bridge Repair will be working on SR-319, DuPont Parkway (LM 2.67), over Southern Railway from 9 a.m.-3 p.m. Monday.

TDOT Maintenance on SR-8 (Signal Mountain Road) in both directions from LM 16.0 to LM 16.0: On Tuesday between 10 a.m.-12 p.m., work involving cutting and removal of a tree will take place.

Utility Work on SR-17 (St. Elmo Avenue) both directions at LM 0.62: Installation of a gas service line to 5006 St. Elmo Ave. will take approximately two to three days to complete. Flaggers will be present while lane is closed from April 23 to May 3 between 9 a.m.-3 p.m.

Utility Work on SR-321 (Ooltewah-Ringgold Road) in both directions at LM 3.79: Installation of a gas main in the ROW will take place that will require crews to bore under SR-321. A new gas main for Grantham Square Subdivision, Bennie Lane and Pine Ridge Road will take two to three days to complete. Flaggers will be present while lane is closed from April 23 to May 3 between 9 a.m.-3 p.m.

Cleaning of the McCallie Tunnel on US-11 (US-64, SR-2), the Stringers Ridge Tunnel on US-127 (SR-8), and the Bachman Tubes on US-41 (US-76, SR-8): The McCallie tunnel is scheduled to be cleaned Wednesday from 8 p.m.-6 a.m. under a flagging operation. The Stringers Ridge tunnel will be cleaned that same night under a signed detour traffic control operation. On Thursday from 8 p.m.-6 a.m., the Bachman tubes will be cleaned under a signed detour operation. Estimated project completion date is June. [Diamond Specialized, Inc./Micka/CNS206]

SR-111 (LM 1.5) Replacement of a collapsed 42" corrugated metal pipe, including grading, drainage, and paving: During this reporting period, the contractor will be addressing punch list items. Estimated project completion date is April. [Thomas Brothers Construction Co., Inc./Pruett/CNS348]

SR-148 (Scenic Highway) Slide repair between LM 2.3 (Sanders Road) and LM 2.5 (Linear Lane): During this report period, the contractor will have one lane closed while they perform stabilization operations to the slide area. One lane of traffic shall remain open at all times. Estimated project completion date is June. [Wright Brothers Construction Company, Inc./Pruett/CNT152]

SR-58 Miscellaneous safety improvements at the intersection of SR-312 (Birchwood Pike) (LM 15.70): The contractor will be completing various safety improvements at the intersection of SR-58 and Birchwood Pike Monday thru Saturday between 5 a.m.-6 p.m. No southbound traffic restrictions will be allowed between 5-9 a.m. No northbound traffic restrictions will be allowed between 3-6 p.m. Flaggers will assist with traffic control as needed. Estimated project completion date is April. [Talley Construction Company, Inc./Pruett/CNS273]



Memorial Day Holiday Garbage And Recycle Collection And Site Schedule

PODCAST: Clint Powell And Dawson Wheeler Interview Grace Ragland

New TN Driver Services App Now Available


Curbside garbage and recycle collection scheduled for Memorial Day, Monday, will be collected as normal. There will be no changes to the collection day. Place containers along the curbside before ... (click for more)

Dawson Wheeler and Clint Powell talked with Grace Ragland about her passion for outdoor life and her battle with MS and cancer. In June of 2018, Ms. Ragland set off on the Grand Depart to ... (click for more)

The Tennessee Department of Safety and Homeland Security Driver Services Division launched a new mobile application that will better serve Tennesseans. The mobile application, titled TN Driver ... (click for more)


Happenings

Chattanooga Native Olivia Buoymaster Serves Aboard Advanced U.S. Navy Warship Half A World Away

SASEBO, Japan – Seaman Olivia Buoymaster, a native of Chattanooga, said she likes a challenge. She was in nursing school, when one day “It just wasn't what I wanted.” She decided the U.S. Navy was. Now, just a year later and half a world away, Seaman Buoymaster serves aboard one of the Navy’s most advanced amphibious ships at Fleet Activities Sasebo, patrolling one of the world’s ... (click for more)

Memorial Day Holiday Garbage And Recycle Collection And Site Schedule

Curbside garbage and recycle collection scheduled for Memorial Day, Monday, will be collected as normal. There will be no changes to the collection day. Place containers along the curbside before 7 a.m. on collection day to ensure pickup. The City Landfill located off of Birchwood Pike in Harrison and the Wood Recycle Center will be closed Monday. The City Landfill and Wood ... (click for more)

Breaking News

Statewide Amber Alert Canceled After Resident Spots Missing 23-Month-Old Girl, Captor In Hixson

A statewide AMBER Alert was canceled after a missing 23-month-old girl in Chattanooga was found early Friday morning. Authorities said Octavia Shaw is safe and her captor, 37-year-old Matias Martinez, is in custody. He was to be charged with especially aggravated kidnapping. He is considered an acquaintance with no parental or custodial rights to Octavia. A resident spotted ... (click for more)

East Ridge Pulls From Rainy Day Fund To Meet No-Tax-Increase Budget

East Ridge will dip into its rainy day fund to be able to make a no-tax-increase budget. A presentation of the city’s 2019-2020 budget was made at the East Ridge City Council on Thursday night. City Manager Chris Dorsey thanked Assistant City Manager Kenny Custer and Financial Director Diane Qualls for their contributions to this budget, saying that it had been very far along ... (click for more)

Opinion

It Is Outrageous That County School Administration Used Our Tax Dollars For Political Lobbying

Dear Dr. Johnson, The campaign central at HCDE headquarters needs a Tennessee Little Hatch Act study time and education. The heart of the issue is that HCDE utilized our tax dollars to lobby against vouchers with employee time, equipment, and lobby payments. Here is my point, I supported ESA vouchers for Hamilton County, and so did a lot of families that desired parental ... (click for more)

Roy Exum: What All Have In Common

A couple of weeks ago I was in the midst of a wonderful crowd and, as we took our places for dinner, there was a bright-eyed fifth-grader seated on my right. Like most his age, he didn’t say much at first but with a nudge or two, he really got it going. He told me how excited he was about going to McCallie this fall and I promised, “Get ready – you are going to have more fun that ... (click for more)