Weekly Road Construction Report

  • Thursday, April 24, 2025

Here is the weekly road construction report for District 29:

BRADLEY COUNTY I-75 at Paul Huff Parkway Interchange modifications: During this reporting period, the contractor will continue work on permanent signs. Intermittent flagging operations and temporary lane closures may be necessary. Motorists are advised to reduce speed and use caution in the work zone. [Summers-Taylor, Inc./Cleveland/CNX362]

 

BRADLEY COUNTY SR-60 widening from the 4-lane north of I-75 (LM 17.2) to SR-306 (LM19.9): During this reporting period, the contractor will continue grading work and install driveways, sidewalk, and curb. Intermittent flagging operations will take place throughout the project during various work activities. The speed limit in the work zone has been reduced to 35 mph. Motorists are advised to use caution in the work zone and watch for flaggers assisting with traffic control. [Summers-Taylor, Inc./Cleveland/CNV130]

 

BRADLEY COUNTY SR-306 [0-5.55] from SR60 to SR308 resurfacing: During this reporting period the contractor will complete construction sign installation and begin stockpiling material. Motorists should be aware of additional truck traffic during this time. Intermittent flagging of traffic may be necessary while work is occurring. [Asphalt Paving Systems, Inc./Cleveland/CNZ021]

 

HAMILTON COUNTY I-75 at I-24 Interchange Reconstruction Phase 2: Nightly Lane closures will occur on this project, 9 PM to 6 AM, on I-75 North and South between Exit 1 (East Ridge) and Exit 3A (East Brainerd Road/ SR-320) and on I-24 East and West from Germantown Road to Spring Creek Road, MM182 to MM185, for various construction activities. Uniformed police officers will be present in these work zones to assist with traffic management and to enforce traffic laws. (Note: Starting at 9 PM on Friday (4/25) night traffic on I-75 North near East Brainerd Road will be reduced from 3 lanes to 2 lanes until 6 AM on Monday (4/28). During this time portions of the concrete pavement will be removed and replaced with a new concrete roadway. Traffic flow will be returned to the previous 3 lanes by 6 AM Monday morning. The contractor is also currently scheduled to have a nightly lane closure on Sunday (4/27) on I-75 North near Exit 3 (East Brainerd Road/SR-320) to shift the current 3 lanes of traffic from the median (inside) of the roadway to the newly constructed outside lanes and bridge over the CSX Railroad. A similar night-time traffic shift is scheduled for I-75 South in this location on Wednesday (4/30). Furthermore, a night-time closure is scheduled for Sunday (4/27) on I-75 South for the installation of a new overhead sign. Traffic shifts scheduled for last week on I-24 have been re-scheduled due to inclement weather. The shift on I-24 East is now planned for Monday (4/28) between 9 PM and 6 AM from close to Belvoir Avenue to Spring Creek Road. This closure is necessary to shift the current 3 lanes of traffic from the outside edge of the roadway to newly constructed median (inside) lanes. On Tuesday (4/29) the contractor will have nighttime lanes closures on I-24 West in the same area to shift the 3 lanes in this direction from an outside alignment to newly constructed lanes in the median (inside). During both I-24 traffic shifts, the present ramps within these areas (Entrance Ramp from South Terrace/ N. Moore Road on I-24 East, Exit Ramp 184 from I-24 West to North Terrace/ N. Moore Road) will be temporarily closed for realignment and detours will be posted. All traffic shifts (I-75 North, I-75 South, I-24 East, I-24 West) are expected to be completed in one night. However, should unanticipated problems occur, all incomplete work for these changes will be carried out the next night. This type of work is very weather sensitive, and should it not be able to be performed on these dates it will take place the next available night.) It may be necessary to do short duration (15 to 30 minutes) rolling roadblocks during the day or night for patching potholes, clearing debris or repairing guardrail, attenuators, etc. Portions of the left lane on North and South Terrace between Germantown Road and Spring Creek Road will remain closed for the installation of drainage structures, sanitary sewers, retaining and noise wall construction. (Note: The contractor currently plans to temporarily close a portion of the right lane on southbound Belvoir Avenue on the bridge over I-24 to work on an area adjacent to the bridge.) All work is weather permitting. The entrance and exit ramps to I-24 between Belvoir Avenue and Moore Road are currently closed. RESTRICTIONS: I-24 Ramps between Belvoir Ave. and S. Moore Road are closed.
 [Wright Brothers Construction Company, Inc./Maj Prj - Blevins/DB2101]

 

HAMILTON COUNTY SR-2 (BRAINERD RD.) Utility Work both directions from LM 14 to LM 15: NIGHTTIME Flagger assisted lane closures on SR-2 (Brainerd Road) between Spring Creek Road and Howell Avenue. Motorists should reduce speed and be prepared to stop. Arrow board/message boards, flaggers, and barrels/cones will be present, 03/03/25 through 05/30/25 from 9 pm - 5 am. [2025-016]

HAMILTON COUNTY SR-2 (BRAINERD RD.) Utility Work westbound from LM 14 to LM 15: NIGHTTIME lane closures on SR-2 (Brainerd Road) between Spring Creek Road and Greenway View Drive. Motorists should reduce speed and be prepared to stop. Arrow board/message boards, flaggers, and barrels/cones will be present, 04/22/25 through 04/30/25 from 10 pm - 5 am. [2025-204]

 

HAMILTON COUNTY SR-2 (CUMMINGS HWY.) Utility Work westbound from LM 2 to LM 3: Shoulder and lane closures on SR-2 (Cummings Hwy) between Lilac Avenue and Starview Lane. Motorists should reduce speed and be prepared to stop if needed. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 04/22/25 thru 04/30/25 from 9 am - 2 pm. [2025-210]

 

HAMILTON COUNTY SR-27 (ROSSVILLE BLVD.) Utility Work both directions from LM 6 to LM 8: Shoulder and lane closures on SR-27 (Rossville Blvd) between E. 31st Street and E. 44th Street. Motorists should reduce speed and be prepared to stop or detour if needed. Arrow board/message boards, flaggers, and barrels/cones will be present, 02/20/25 thru 05/22/25 from 9 am - 2 pm. [2024-768, 769, 770]

 

HAMILTON COUNTY SR-27 (SUCK CREEK RD.) Permitted Work both directions from LM 2.2 to LM 2.4: From 04/21/2025 to 05/19/2025 contractor will be installing a cross-drain roadway will be reduced to single lane controlled by temporary traffic lights for the duration of this install.

 

HAMILTON COUNTY SR-319 (DUPONT PKWY.) TDOT Bridge Inspection both directions at LM 2.22: An in-depth inspection of C.B. Robinson Bridge, which carries Dupont Parkway over the Tennessee River, will require lane closures daily from 8 am until 5 pm on April 22, 23 and 24. The inspection is scheduled to begin on Tuesday, April 22nd at 8 am in the northbound righthand lane and shoulder, which will remain closed until 5:00 pm or until the inspection of the northbound bridge is complete. The inspection will then move to the righthand lane and outside shoulder on the southbound bridge. This work is weather dependent. If inclement weather creates delays, inspections will resume on Friday, April 25th. Motorists are asked to be alert, obey message boards and temporary traffic control devices. Use caution and be prepared to merge left as you approach the bridge.

 

HAMILTON COUNTY SR-8 (MARKET ST.) Utility Work both directions from LM 8.5 to LM 9.5: Shoulder and lane closures on SR-8 (Market Street) between W./E. 4th Street and W./E. M L King Blvd. Motorists should reduce speed and be prepared to stop if needed. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 04/24/25 thru 05/16/25 from 9 am - 2 pm. [2025-063]

 

HAMILTON COUNTY I-124 (US-27) from I-24 Interchange to South of the Tennessee River Bridge: Daily lane closures are possible between 9 AM and 3:30 PM as the contractor work along the ramps and 4th Street. Motorists are advised to reduce speed in the work zone and watch for flaggers assisting with traffic control. [Stansell Electric Company, Inc./Chattanooga East/CNY900]

 

HAMILTON COUNTY I-75 at the Hamilton Place Mall interchange: The SR-153 southbound ramp to I-75 northbound has been reduced to one lane. Traffic shifts have been implemented on I-75 northbound, Shallowford Road entrance ramps, and Shallowford Road exit ramps and Hamilton Place Mall exit ramp. Hamilton Loop Road is closed for retaining wall construction and storm drainage installation between the intersections near Markman’s Jewelers and Texas Roadhouse. On 04/30/25 the contractor will close 2 right lanes of I-75 NB and I-75 SB from MM 3.8 to MM 6.0 to pour the concrete bridge deck at Hamilton Place Mall. The speed limit has been reduced on I-75 throughout the project limits. Nightly lane closures are permitted 8 PM to 6 AM. Motorists should use caution, paying attention to construction signage and watching for construction vehicles and personnel. [Summers-Taylor, Inc./Chattanooga West/CNX358]

 

HAMILTON COUNTY SR-317 (Apison Pike) improvement project from SR-321 (Ooltewah-Ringgold Road) to east of Layton Lane: Lane closures and flagging operations will be required on SR-317, Apison Pike, for bridge and grading work. The flagging operations will be performed on 04/24/25, 04/25/25, 04/28/25, 04/29/25, and 04/30/25 from 7 AM to 1 PM and 3 PM to 7 PM. Closures will last about 2 hours per location. The contractor will have intermittent flagging operations during daytime non-peak hours for bridge work, delivery of materials and equipment.
 [Wright Brothers Construction Company, Inc./Chattanooga East/CNT336]

 

MCMINN COUNTY SR-39 construction of a bridge over Middle Creek (LM 13.4): During this reporting period, the Northbound and Southbound traffic will be reduced to one lane and controlled by traffic signals. County road 567 will be closed to traffic (LOCAL TRAFFIC ONLY) and detoured to SR039. This closure is necessary to perform the bridge replacement. The lane restriction will remain in place until the bridge replacement is completed.
 [Whaley Construction, LLC/Chattanooga East/CNX069]

 

MCMINN COUNTY SR-39 from west of Cook Drive to SR-30 and from SR-310 to the Monroe County Line: During this reporting period the contractor will continue work on ADA curb ramps. Motorists should be aware of workers in the area performing this work. Intermittent lane closures and flagging operations around the work area may be necessary.
 [Rogers Group, Inc./Cleveland/CNZ038]

 

POLK COUNTY SR-68 construction of bridge over Brush Creek (LM 16.4): During this update period, the contractor will continue phase 2 bridge construction. A temporary traffic signal system is active on SR-68 near LM 16.4. The northbound lane of SR-68 will be closed in the area controlled by the temporary traffic signal system. Motorists are advised to reduce speed and use caution in the work zone. Motorists should also be aware that traffic was recently moved onto a portion of the new bridge and there is a new traffic pattern through the project site.
 [Wright Brothers Construction Company, Inc./Cleveland/CNX347]

POLK COUNTY SR-68 over SR-40 the construction of bridges: During this reporting period the contractor will continue construction sign installation. Motorists should be aware of workers in the area performing this work. Intermittent flagging operations around the work area may be necessary. [Wright Brothers Construction Company, Inc./Cleveland/CNZ042]

 

RHEA COUNTY SR-30 repair of bridge over Tennessee River: The repair of the bridge on S.R. 30 over the Tennessee River (L.M. 17.28): The bridge has been reduced to one lane of traffic under the control of a traffic signal. The contractor will be making repairs under the Tennessee River Bridge. Watercraft users should use caution when accessing the TWRA boating ramp under the bridge in Rhea County. The contractor will have equipment and materials in the area of the access road for the boating ramp. [Mid-State Construction Company, Inc./Chattanooga East/CNY201]

Government
Weekly Road Construction Report
  • 4/24/2025

Here is the weekly road construction report for District 29: BRADLEY COUNTY I-75 at Paul Huff Parkway Interchange modifications: During this reporting period, the contractor will continue ... more

Grand Jury No Bills, True Bills, And Dismissed
  • 4/24/2025

Here are the Grand Jury No Bills, True Bills, and Dismissed: No Bills: 1 JONES, JADEN LEBRON DRIVING WITHOUT DRIVERS LICENSE / EXPIRED LICENSE 04/23/2025 True Bills: 319737 1 BEARD, ... more

Bid Opening For Hickory Valley Bridge Rehabilitation Project Postponed To May 1
  • 4/24/2025

The city of Chattanooga has announced that the bid opening for the Hickory Valley Bridge Rehabilitation Project, originally scheduled for Thursday, April 24, has been officially postponed to ... more